Mission Console
OP

Mission Operations

MSN-4471 · Yard Logistics Loop · KIRRA-09

Simulated dataIn progressETA 13:15

Fleet Mission Gantt

6 missions · 10:00–14:00 · 4h window

now 12:29
10:0011:0012:0013:0014:00
KIRRA-09
Yard Logistics Loop
KIRRA-07
Perimeter Patrol B
KIRRA-12
Pallet Run 18
KIRRA-10
Aisle Inspection
KIRRA-13
Yard Transit
KIRRA-14
Survey Sweep
completedactiveheld / degradedlockoutqueued now
transit load / unload loop charge survey hold lockout queued

Mission Timeline

64% complete · started 10:42

done
Dispatch
done
Transit A
done
Pick
active
Transit B
pending
Place
pending
Return

Waypoint Progress

route plan

  • Depot exit
    WP-01
    done
  • Aisle 4 junction
    WP-02
    done
  • Pick bay 12
    WP-03
    done
  • Cross-dock
    WP-04
    2m 10s
  • Place bay 7
    WP-05
    6m 40s
  • Depot return
    WP-06
    12m 05s

Task Completion

Payload secured100%
Route adherence96%
Clearance checks88%
Handoff confirmation40%

Risk Assessment

composite operational risk

18LOW risk
  • Pedestrian proximityLOW
  • Path congestionMEDIUM
  • Sensor degradation (radar)MEDIUM
  • Comms stabilityLOW

Operator Interventions

human-in-the-loop actions

  • 11:58Manual hold — crossing clearance
  • 11:12Re-route approved (aisle 4 blocked)