Mission Operations
MSN-4471 · Yard Logistics Loop · KIRRA-09
Simulated dataIn progressETA 13:15
Fleet Mission Gantt
6 missions · 10:00–14:00 · 4h window
10:0011:0012:0013:0014:00
KIRRA-09
Yard Logistics Loop
KIRRA-07
Perimeter Patrol B
KIRRA-12
Pallet Run 18
KIRRA-10
Aisle Inspection
KIRRA-13
Yard Transit
KIRRA-14
Survey Sweep
completedactiveheld / degradedlockoutqueued now
transit load / unload loop charge survey hold lockout queued
Mission Timeline
64% complete · started 10:42
done
Dispatch
done
Transit A
done
Pick
active
Transit B
pending
Place
pending
Return
Waypoint Progress
route plan
- doneDepot exitWP-01
- doneAisle 4 junctionWP-02
- donePick bay 12WP-03
- 2m 10sCross-dockWP-04
- 6m 40sPlace bay 7WP-05
- 12m 05sDepot returnWP-06
Task Completion
Payload secured100%
Route adherence96%
Clearance checks88%
Handoff confirmation40%
Risk Assessment
composite operational risk
18LOW risk
- Pedestrian proximityLOW
- Path congestionMEDIUM
- Sensor degradation (radar)MEDIUM
- Comms stabilityLOW
Operator Interventions
human-in-the-loop actions
- 11:58Manual hold — crossing clearance
- 11:12Re-route approved (aisle 4 blocked)