Skip to content
KIRRA
Mission Console
OP

KIRRA-11 Digital Twin

Atlas-X · firmware v2.4.1 · uptime 88d 01h

Connecting…NominalAK Trusted
Battery
73%
Power draw
250 W
Est. range
9.0 km
Status
online

Pose & Attitude

orientation · IMU

N
41°
yaw
2°
pitch
-1°
roll
NE
head

Live Telemetry

velocity · acceleration · localization confidence

50 Hz
Velocity2.78 m/s
Acceleration-0.02 m/s²
Localization conf.95.42 %

Posture History

demo · 12 events

demo
Nominalcurrent posture
Nominal → Degraded → LockedOutno faults in window

Kinematic Envelope

proposed vs certified hard limits

  • Linear velocity3.2 m/s / ≤ 22.4 m/s
    14%
  • Angular velocity0.22 rad/s / ≤ 0.80 rad/s
    28%
  • Lateral accel0.9 m/s² / ≤ 2.5 m/s²
    36%
  • Sensor confidence0.94 / ≥ 0.60
    30%

Subsystem Health

  • LiDAR (top)99%OK
  • Radar (front)97%OK
  • IMU100%OK
  • Drive train98%OK
  • Brake channel A/B100%2/2 OK
  • Comms (DDS)99%OK

Position Trace

last 40 fixes · ego marker live

Hardware Attestation

per-node Ed25519 proof

Node idKIRRA-11
AK digestak:a9f0…71
PCR16sha256:0x9f…c1
Last verified12:04:50
Trust stateTrusted

Federated Trust

demo · cross-controller

demo
  • peer-controller-westNominalvalid 3s
  • peer-controller-eastNominalvalid 4s

Fabric State

demo · cross-asset DAG

demo
Fabric postureNominal
Asset generation4471
Contributing nodesKIRRA-11, fleet-dag
Blocked bynothing

Thermal

component temperatures

  • Drive motor
    48°C
  • Battery pack
    32°C
  • Compute (Orin)
    61°C
  • Brake assembly
    40°C

Actuator Load

per-channel duty cycle

  • Drive · left38%
  • Drive · right41%
  • Steering22%
  • Lift / mast0%

Mission Timeline

current assignment

  1. Dispatchdone
  2. Transitdone
  3. Pick & placeactive
  4. Returnpending

Command Stream

recent actuator commands · governor verdict

TimeChannelValueVerdict
12:04:51cmd_vel.linear3.20 m/sALLOW
12:04:51cmd_vel.angular0.22 rad/sALLOW
12:04:50drive_to_poseaisle-7 → dock-3ALLOW
12:04:49cmd_vel.linear3.18 m/sALLOW